The ParaTrack Gyro Module (GM) is designed to extend the capabilities of ParaTrack HDD Guidance in areas where interference poses operational challenges for magnetic tracking and surveying …
Read MoreGyro Module
River Crossing Guided by Gyro
A telecom operator contracted a new fiber-optic data line run beneath a busy waterway with no room for surface verification at entry and the plan containing a 35° s-turn with tight tolerances for the …
Read MoreRomsdal Gondola
The Romsdal gondola, a state of the art electric cable car, is set to welcome visitors beginning in May 2021. A service conduit was required to provide the restaurants and other services atop Nesaksla mountain …
Read MoreParallel Water Main Replacement
A municipality required the replacement of a pair of 100-year old unlined cast iron water mains. In their place new 20” ductile iron would be run inside 32” steel sleeves. Strict design tolerances dictated that the …
Read More