Independent Survey Verification
ParaTrack P2 is the evolution of magnetic wire guidance. A fast and accurate tracking system for Horizontal Directional Drilling (HDD).
Power You Can Count On
ParaTrack P2 converts AC mains power to a variable current AC waveform, driven through a guide wire. Current flow on the guide wire generates a powerful magnetic field at <10Hz, designed to be resistant to interference from surrounding infrastructure – providing reliable survey verification in any environment.
Trust, But Verify
By providing a direct measurement to the drilling assembly underground, ParaTrack P2 enhances the accuracy of HDD pilot bore surveys. As drill lengths grow longer and profiles more complex, it is critical to both survey pilot bore positions, and verify them. ParaTrack2 delivers verifiable results, eliminating surprises.
Benefits
- Provides an independent reference verifying the accuracy of pilot bore surveys
- Accurate guidance at depths up to 1500 feet
Applications
- HDD pilot bore tracking
- Positional verification
ParaTrack P2 AC Wire Guidance is part of the complete line of ParaTrack HDD guidance tools. Available exclusively from your Inrock or Prime Horizontal dealer.
Related Posts
Nuts and Bolts of Guidance
Horizontal Directional Drilling (HDD) continues to experience rapid growth with proven effectiveness across a diverse range of installations. HDD is an essential part of the expansion and replacement of …
World Record Dual HDD Intersects in India
Numaligarh Refinery Limited (NRL) is in the process of laying a 1635km cross country pipeline from Paradip Port in Odisha to their refinery Numaligarh, Assam, India. The pipeline is proposed to run from …
Multiple Parallel Bores
Multiple power lines from a major off-shore wind installation needed to be run in parallel under a railway within a narrow right of way in order to connect to the inland power distribution station …
Romsdal Gondola
The Romsdal gondola, a state of the art electric cable car, is set to welcome visitors beginning in May 2021. A service conduit was required to provide the restaurants and other services atop Nesaksla mountain …
Parallel Water Main Replacement
A municipality required the replacement of a pair of 100-year old unlined cast iron water mains. In their place new 20” ductile iron would be run inside 32” steel sleeves. Strict design tolerances dictated that the …