A municipality required the replacement of a pair of 100-year old unlined cast iron water mains. In their place new 20” ductile iron would be run inside 32” steel sleeves. Strict design tolerances dictated that the …
Read MorePosts
Steering Tool
Field-proven on jobsites across the globe, the Steering Tool is the foundation on which the ParaTrack HDD Guidance System is built. Equipped with sophisticated magnetic and gravity sensors, the Steering …
Read More